Reference
YEAR |
CUSTOMER |
SITE |
WORKS |
2008 |
Sime Darby Engineering (Malaysia) |
Bul Hanine |
Engineering activities and installation of no. 4 independent umbilical in Bul Hanine Field of Qatar Petroleum Engineering activities and platform pull-in operation for 6 strapped umbilical in Bul Hanine and Maydan Mahzam fields of Qatar Petroleum. |
2009 |
Tratos Cavi |
Adriatic LNG |
Connection of optical fibre cables on topside patch panels into the the platform in Porto Viro for the connection of the Adriatic LNG - Regasifier and testing of the topside connections. |
work under execution |
EDISON S.p.A. |
Off-Shore Vasto |
Supply of 1.830 mts. of 6/10 kV static/dynamic submarine cable 3x150 mm˛ and relevant accessories. Supervision to cable laying and execution of connection accessories for parallel connection Single Mooring System Alba Marina and Rospo Mare B Platform. |
work under execution |
Saipem
|
Olowi Field |
Availability of MBB-120 spooler and relevant personnel for laying of no. 3 flexible pipes for platform connections in the Olowi Field. |
work under execution |
Micoperi |
North Adriatic Sea |
Installation of 10 kV submarine cable connecting IZABELA NORTH to IZABELA SOUTH platforms for final costumer ED-Ina in North of Adriatic sea. |