WORKS |
2008 |
Sime Darby Engineering (Malaysia) |
Bul Hanine |
Engineering activities and installation of no. 4 independent umbilical in Bul Hanine Field of Qatar Petroleum Engineering activities and platform pull- |
2009 |
Tratos Cavi |
Adriatic LNG |
Connection of optical fibre cables on topside patch panels into the the platform in Porto Viro for the connection of the Adriatic LNG - |
work under execution |
EDISON S.p.A. |
Off- |
Supply of 1.830 mts. of 6/10 kV static/dynamic submarine cable 3x150 mm² and relevant accessories. Supervision to cable laying and execution of connection accessories for parallel connection Single Mooring System Alba Marina and Rospo Mare B Platform. |
work under execution |
Saipem |
Olowi Field |
Availability of MBB- |
work under execution |
Micoperi |
North Adriatic Sea |
Installation of 10 kV submarine cable connecting IZABELA NORTH to IZABELA SOUTH platforms for final costumer ED- |