P.C.S. ITALIANA srl - Via Fratelli Rosselli, 24 - 10032 Brandizzo (TO) ITALY - Tel : +39 011 91 70 260 - Fax: +39 011 91 39 540
Unico Socio - Cap. Soc. € 200.000,00 (i.v.) *P.I. 03027420961 *C.F. 02114860964 *C.C.I.A.A. (TO) 907386 * Trib (MI) 33149/8239/49
SPOOLER
Spooler
is
a
motorised
system
to
coil/uncoil
cable
reels,
essential
in
operations
such
as
coiling
from
a
drum
to
another,
cable
laying,
cable
salvaging to make repositioning or repair.
All
our
Spoolers
are
designed
to
suite
a
wide
range
of
reels
sizes
and
width.
Our spoolers have a capability from 10 Tons up to 440 Tons.
EQUIPMENT
BASKET & TURN TABLE
In
some
cases,
cable
characteristics,
dimensions
and
length
require
cable
coiling
on
basket
or
turn-table
tank,
to
avoid
damages
to
the
cable
itself
and
to
facilitate
laying
operations.
P.C.S.
design
and
manufacture
according
to
the
cable
technical
requirements
baskets
and
turn-table
tanks
with different capability and mechanism, to suit all cables specifications.
TENSIONER
The
TENSIONER
(L.M.)
has
the
essential
purpose
to
mantain
the
correct
residual
tension
on
the
cable,
working
as
brake
during
cable
laying
or
as
pulling
winch
while
loading
the
cable
on
board.
The
2
vertically
opposed
crawlers
allow
the
cable
to
pass
mantaining
on
it
the
required
amount
of
grip pressure
HYDRAULIC UNIT
Hydraulic
units
are
essential
to
generate
power
for
all
laying
equipment.
P.C.S.
has
availability
of
different
motorization,
according
to
the
power
needed
by
a
specific
outfit
to
be
used.
The
remote
control
allows
a
better
and safer operations for the equipment.
POWER GENERATOR
The
main
p.c.s.equipment
is
feed
by
hydraulic
unit,
but
for
any
need
we
have availability of power generator able to produce 6 to 250kw.
CHUTE / STINGER
The
stinger
is
the
essential
mean
to
facilitate
the
cable
lay
from
the
deck
and
grant
the
correct
angle
exit,
according
to
the
minimum
bending
radius
imposed by cable/umbilical manufacturer.
REMOTE CONTROL ROOM
This
consolle
allows
remote
operating
and
control
of
the
laying
equipment.
it can be set in “automatic” operation or in “manual”.
the
system
is
completed
by
a
tv
circuit
which
allows
a
constant
check
of
the
operations
and
a
full
record
of
all
necessary
parameters
such
as:
cable
pulling
tension,
exit
angle
of
cable
from
the
stinger,
length
of
cable
laid,
bathymetry, gps position.
the
control
consolle
is
operated
by
a
last
generation
portable
pc
with
digital
card i/o and color printer.
TEST & CHECK
P.C.S. has available intruments for cable/umbilical test and check as:
Rigidimeters (from 24 kV to 110 kV)
Meggers
Teleflex
O.T.D.R.
Ohmmeters
H.L.U.
to be used before, during and after laying operation.
PULL-IN
The
pull-in
equipment
is
comprising
hydraulic
tirfors
up
to
5t
capacity
and
motorized
tirofs
upto
3200kg
capacity,
electro-hydraulic
unit
to
be
connected
to
the
tirfors
and
is
completed
by
dinamometers
up
to
50kn
to
check
continuously
the
pulling
force
applied
to
the
cable
during
the
pull-in
operations.
furthermore
our
pull-in
equipment
comprises
power
generators
3-6kw
baskets
to
transfer
the
equipment
to
platforms
and
miscellaneous
as
specific clamps and iron cables to install the equipment on platform.
INCAVATRICE
I
n
the
aim
of
optimize
resources
and
reduce
timing
executing
the
works,
P.C.S.
engineered
and
developed
the
“Incavatrice”
a
system
to
bury
cable/umbilical simoultaneously or immediately after laying.
The
past
experiences
driven
to
manufacture
different
incavatrice
models,
each
implemented
according
to
different
sea-bottoms
consistence
gaining
a
range
suitable
for
ground
hardness
up
to
150kPa,
and
actually
is
on
an
engineering
phase
an
Incavatrice
able
to
operate
on
sea-bottom
with
500kPa hardness.
Each
“Incavatrice”
is
normally
made
according
to
the
Minimum
Bending
Radius
(MBR)
and
size
of
cable,
umbilical
or
flowline
to
be
buried.
Any
technical
characteristic
it
has,
the
Incavatrice
system
is
the
most
suitable
to
preserve
sea-bottom,
reducing
has
much
as
possible
environmental
changes and pollution.
Anti pollution cautions
Our
“incavatrice”
equipment
does
not
modify
the
ground
characteristics
and
does
not
pollute
the
surrounding
waters;
without
affecting
the
environment
along the route.
UMBILICAL TEST & FLUSHING